Commercial Fit-Out in Abu Dhabi: Beauty by Mikas Salon & Wellness Center

Arcave’s Turnkey Fit-Out Solution: Approvals, MEP & interior Design

Home/Projects/Beauty by Mikas Salon, Abu Dhabi

Commercial Fit-Out

Beauty by Mikas Salon Al Muntazah

A massive 1,200 sqm residential-to-commercial villa conversion in Abu Dhabi, delivered as a complete turnkey fit-out and luxury interior design solution for a three-floor premium salon and wellness center.

Category
Commercial Interior Design
Location
Al Muntazah, Abu Dhabi
Scope
Turnkey Fit-Out Solution
Size
1,200 sqm (3 Floors)

When Beauty by Mikas made the strategic decision to expand their boutique brand into a comprehensive, fully functional salon, spa, and wellness center, they secured a massive 1,200 square meter, three-floor villa in the Al Muntazah area of Abu Dhabi.

The vision was stunning. The reality of the execution, however, presented an immediate structural roadblock: it was a residential property. Transforming a residential shell into a high-capacity commercial project requires far more than aesthetic interior design; it demands complex structural engineering, rigorous regulatory approvals, and an uncompromising turnkey solution.

The Challenge

Converting a residential shell into a commercial operation

In a commercial salon, MEP (Mechanical, Electrical, and Plumbing) is the backbone of the entire operation. The existing villa was equipped with basic, residential-grade air conditioning and standard plumbing. A luxury salon interior design requires massive electrical loads for hair styling equipment, powerful exhaust systems, and high-capacity air conditioning to counter thermal loads. The existing AC was entirely inadequate and needed a heavy-duty upgrade.

Furthermore, the specialized drainage requirements for pedicure and manicure stations meant the entire plumbing system had to be demolished and re-engineered. Building the complex water supply and drainage systems into newly poured, raised concrete platforms with millimeter-perfect sloping became the most complex technical challenge of the interior fit-out phase.

Arcave's Solution

Acoustic zoning and value engineering without compromise

Before laying a single tile, Arcave managed the complex residential-to-commercial conversion paperwork, securing all necessary ADM, DMT, and Civil Defense approvals. When executing the interior design layout, spatial flow and acoustic zoning were critical. To preserve a tranquil atmosphere, the bustling hair styling stations were completely isolated from the luxury nail and spa sections using heavy acoustic sliding glass doors. This ensures the noise of hair dryers cannot travel into the relaxing pedicure treatment lounge.

During the fit-out, the client requested value engineering options to manage the budget. While Arcave successfully sourced high-quality local alternative materials to control costs, we refused to compromise on foundational build quality. When standard gypsum board was proposed for the wet areas to save money, Arcave insisted on installing premium MR (Moisture Resistant) cement board. In a commercial spa and salon fit-out, cutting corners on waterproofing inevitably leads to failure, and our interior design philosophy prioritizes long-term durability.

Construction progress

Built, step by step.

From residential strip out to commercial handover. Drag the marker or click any stage below to see how it came together.

10% Demolition
10%20%30%40%50% 60%70%80%90%100%
★★★★★

"Arcave's ability to manage the entire turnkey fit-out—from the complex residential-to-commercial authority approvals to the final interior design details—allowed us to scale our brand seamlessly. Their strict structural planning and refusal to compromise on material quality gave us complete confidence in our new 1,200 sqm wellness center."

Management, Beauty by Mikas Salon & Wellness Center

Project FAQ

Common questions.

How do you manage cost and time on a massive 1,200 sqm commercial project without compromising quality?
Through strategic value engineering. We work closely with the client's budget by sourcing premium local alternative materials for finishes. However, as an expert turnkey solutions provider, we never compromise on foundational durability—such as insisting on MR cement boards over standard gypsum in wet areas. We provide a solid, structured project plan and adhere to it strictly.
What does a "turnkey solution" actually include for a salon interior design project?
A turnkey commercial fit-out covers everything from initial space planning and 3D interior design to the physical construction, MEP upgrades (AC, plumbing, electrical), custom joinery, flooring, and securing all mandatory Abu Dhabi municipal and Civil Defense approvals under one single contract.
Does Arcave handle the DMT and Civil Defense approvals for residential-to-commercial villa conversions?
Absolutely. Converting a residential villa into a commercial project requires deep regulatory expertise. Arcave coordinates the full conversion process, fast-tracking Civil Defense, ADM, and DMT approvals as a core part of our design and build service.
Why is MEP so critical in a hospitality or salon fit-out?
Salons generate immense thermal heat from styling tools and require heavy water usage. Upgrading legacy residential MEP to commercial capacity is vital to prevent AC failure, ensure proper ventilation, and guarantee that complex drainage systems (like raised concrete pedicure platforms) function flawlessly.
Beauty by Mikas Head Office Fit-out Abu Dhabi

Planning a commercial fit-out project?

Get a complimentary design consultation with our team at Arcave.

← Back to all projects